Permits
Here you'll find all of the various permits issued by the City of Fridley. Permits ensure City ordinances are being followed and our community is safe.
Jump to:
Building Permits
Find residential and commercial applications for building, demolition, mechanical, plumbing and electrical. The City of Fridley Building Inspections Department is responsible for administering the Minnesota State Building Code.
Questions? Call the Building Inspections Division by phone at 763-572-3604 or by email at BuildingInspections@FridleyMN.gov.
E-Permits
As of February 1, 2022, all permits shall be applied for online using the new online portal.
Permit Types
- Additions
- Accessory Structures (over 200 square feet)
- Basement Finish
- Decks
- Demolition
- Electrical
- Garages (attached/detached)
- Mechanical/HVAC @(Model.BulletStyle == CivicPlus.Entities.Modules.Layout.Enums.BulletStyle.Decimal ? "ol" : "ul")>
- New Construction
- Plumbing
- Remodeling
- Roofing
- Siding
- Tenant Finishes
- Windows @(Model.BulletStyle == CivicPlus.Entities.Modules.Layout.Enums.BulletStyle.Decimal ? "ol" : "ul")>
Rental Properties: All permits shall be obtained by a licensed contractor.
Inspections
Inspections are required for all permits. Upon issuance of a permit, an inspection record card will be provided and will identify the required inspections for each project. Inspection requests must be called in to the Building Inspections Department at 763-572-3604. Please allow a minimum of 24-hour notice for all inspections.
Electrical inspections must be scheduled with the electrical inspector, Andrew Nykanen, online at TokleInspections.com or 763-754-2983.
Note: Please have the permit number ready when calling for inspections.
Building Permits - Commercial
A city commercial or specialty contractor license is required for all commercial building permit applications. See the Contractor License tab below for more information.
How do I get a permit?
All permits may be obtained by applying on our E-Permit portal.
Apply Online
Plan Review Submittal Requirements
Review Process
Once the online application submittal has been received and the application intake has been complete, the approval process may take up to 3 weeks (15 business days). Please make sure to review the plan review submittal requirements listed above to prepare required documents prior to applying for the permit.
Fees
The Building Permit Fee is based off the total job valuation (including labor and materials). To calculate the permit fee, see the table below.
Total Value | Fees |
$1 to $500 | $23.50 (Minimum Fee is $23.50 plus surcharge) |
$501 to $2,000 | $23.50 for 1st $500 plus $3.05 for each additional $100 or fraction, to and including $2,000 |
$2,001 to $25,000 | $69.25 for 1st $2,000 plus $14 for each additional $1,000 or fraction, to and including $25,000 |
$25,001 to $50,000 | $391.25 for 1st $25,000 plus $10.10 for each additional $1,000 or fraction, to and including $50,000 |
$50,001 to $100,000 | $643.75 for 1st $50,000 plus $7 for each additional $1,000 or fraction, to and including $100,000 |
$100,001 to $500,000 | $993.75 for 1st $100,000 plus $5.60 for each additional $1,000 or fraction to and including $500,000 |
$500,001 to $1,000,000 | $3,233.75 for the 1st $500,000 plus $4.75 for each additional $1,000 or fraction, to and including $1,000,000 |
$1,000,00 and up | $5,608.75 for the 1st $1,000,000 plus $3.15 for each additional $1,000 or fraction |
Plan Check Fee (for applications that require a plan review) are 65% of the building permit fee.
Fire Surcharge is .001 times the total job valuation.
State Surcharge is .0005 times the total job valuation.
SAC Charge is $2,485 per SAC unit. This is determined by Metropolitan Council. It is the applicant's responsibility to apply for the SAC Determination with Metropolitan Council prior to applying for a commercial building permit for the following type of work: Addition, New Construction, Interior Alteration/Tenant Finish and Remodel.
Miscellaneous Documents
Building Permits - Residential
How do I get a permit?
All permits may be obtained by applying on our E-Permit portal.
Rental Properties: all permits shall be obtained by a licensed contractor.
A city contractor license is required for all HVAC, mechanical and gas services projects (furnace, air conditioning, ductwork, gas dryer, fireplace, etc.) For the full list, see the Contractor License tab below.
Fees
The building permit fee is based off of the total job valuation (including labor and materials). To calculate the permit fee, see the table below:
Total Value | Fees |
$1 to $500 | $23.50 (Minimum fee is $23.50 plus surcharge) |
$501 to $2,000 | $23.50 for the 1st $500 plus $3.05 for each additional $100 or fraction, to and including $2,000 |
$2,001 to $25,000 | $69.25 for the 1st $2,000 plus $14 for each additional $1,000 or fraction, to and including $25,000 |
$25,001 to $50,000 | $391.25 for the 1st $25,000 plus $10.10 for each additional $1,000 or fraction, to and including $50,000 |
$50,001 to $100,000 | $643.75 for the 1st $50,000 plus $7 for each additional $1,000 or fraction, to and including $100,000 |
$100,001 to $500,000 | $993.75 for the 1st $100,000 plus $5.60 for each additional $1,000 or fraction, to and including $500,000 |
$500,001 to $1,000,000 | $3,233.75 for the 1st $500,000 plus $4.75 for each additional $1,000 or fraction, to and including $1,000,000 |
$1,000,001 and up | $5,608.75 for the 1st $1,000,000 plus $3.15 for each additional $1,000 or fraction |
Plan Check Fee is 65% of the building permit fee (for permits that require a plan review).
Fire Surcharge is .001 times the total job valuation.
State Surcharge is .0005 times the total job valuation.
License Surcharge is a flat fee of 5.00. This is charged when a contractor is doing the work.
Re-Roof Permit Fees
The permit fees for residential re-roof is based on the total number of squares. To calculate the number of squares: 1 SQ = 3 Bundles = 10 x 10 = 100 SQ FT.
Click here to view the Residential Re-Roof Permit Fees
Doors:
The City of Fridley does not require a permit for door replacements going into existing openings such as a patio, entry, bedroom, etc.
We require a door permit for the following type of work:
- Garage to Dwelling door (new or replacement)
- New Door Opening (interior or exterior)
- Altering of a door opening (interior or exterior)
Miscellaneous Documents
This is a monthly report which has been prepared based on requests from the public. The report is a summary of all of the building permits that have been issued for the month. The report should be available within seven days after the end of the month.
As this is a new process, we are beginning with year 2018. If you have any questions regarding this report, you may contact the Building Inspections Department by phone at 763-572-3604 or email buildinginspections@fridleymn.gov
City Contractor License
The City of Fridley requires a city contractor license for the following:
Blacktopping |
Chimney Sweep |
Commercial or Specialty |
Excavating |
Gas Services |
HVAC/Heating |
Masonry |
Oil Services |
Plastering |
Roofing (Commercial) |
Sign Erector |
Wrecking |
License fee is $35.00 each
License Term:
Valid one year from date of issuance
Renewals:
A new license shall be applied for each year by the contractor.
Insurance Requirements:
Certificate of Insurance evidencing the holding of Public Liability Insurance in the limits of:
- $50,000 per person
- $100,000 each accident for bodily injury
- $25,000 for property damage
Workers Compensation as required by Minnesota Statute 176.182.
The SP:C1 form is required for all contractor licenses. (found here)
A Critical Area permit is required to:
- Construct any structures, impervious surfaces, or facilities on a property with frontage along the Mississippi River, frontage along a natural drainage route, or with a bluff that is not already subject to a building permit
- Perform any intensive vegetation clearing (removal of contiguous trees or shrubs) within a primary conservation area
- Perform any land alteration within the bluff impact zone or water quality impact zone.
You can find more information on the Critical Area page.
Current Minnesota State Building Codes can be found by clicking on the link below.
Electrical Permits
The City of Fridley processes our own electrical permits and goes through a 3rd party inspector for inspections.
Rental Properties: all permits shall be obtained by a licensed contractor.
Inspections
Required inspections should be scheduled with the electrical inspector Andrew Nykanen by calling 763-754-2983 Monday-Friday from 7 a.m. - 8:30 p.m. or emailing Tokleinspections.com.
Fees
Below is the fee worksheet for the electrical permits (residential and commercial). Minimum fee is $40 plus $1.00 surcharge.
Fee Type | Fee Total |
0 to 400 Amp Power Source | $50 each |
401 to 800 Amp Power Source | $100 each |
Over 800 Amp Power Source | $150 each |
0 to 200 Amp Circuit or Feeder | $8 each |
Over 200 Amp Circuit or Feeder | $30 each |
0 to 400 Amp Power Source (Over 250 Volts) | $100 each |
401 to 800 Amp Power Source (Over 250 Volts) | $200 each |
Over 800 Amp Power Source (Over 250 Volts) | $300 each |
0 to 200 Amp Circuit or Feeder (Over 250 Volts) | $16 each |
Over 200 Amp Circuit or Feeder (Over 250 Volts) | $60 each |
Panel Changes (reconnect existing circuit or feeder for panelboard replacement) | $100 each |
New 1 & 2 Family homes up to 25 circuits, 3 trips | $175 each |
New Multi-Family Dwelling Unit (with up to 2 circuits & feeders per unit) | $100 / dwelling unit |
New Multi-Family Dwelling Unit (additional circuits over 20 per unit) | $8 / feeder or circuit |
Existing Multi-Family Dwelling Unit (up to 10 feeders or circuits are installed or extended) | $100 / unit |
Existing Multi-Family Dwelling Unit (where less than 10 feeders or circuits are installed or extended) | $8 / feeder or circuit |
Additional circuits over 25 per unit | $8 each |
Circuits extended or modified | $8 each |
Retrofitting of existing lighting fixtures | $1 each |
Manufactured Home Park Lot Supply + Circuits | $50 / Ped |
Separate Bonding Inspection | $40 |
Pools - plus circuits | $80 |
Inspection of concrete encased grounding electrode | $40 |
Technology circuits & circuits less than 50 volts | $1 / device |
Traffic signals, street, parking & outdoor lighting standards | $5 each |
Transformers for light, heat & power (0 to 10 KVA) | $20 each |
Transformers for light, heat & power (more than 10 KVA) | $40 each |
Transformers for electronic power supplies & outline lighting | $5.50 each |
Additional inspection trip(s), Re-inspections | $40 each |
Minnesota Solar PV System Electrical Inspection Fee Chart
Solar PV System Rating* | Inspection Fees |
0 - 5,000 watts (5 kw) | $60 |
5,001 - 10,000 watts (5 kw - 10 kw) | $100 |
10,001 - 20,000 watts (10 kw - 20 kw) | $150 |
20,001 - 30,000 watts (20 kw - 30 kw) | $200 |
30,001 - 40,000 watts (30 kw - 40 kw) | $250 |
40,001 and larger watts (40 kw) | $250, and $25 for each additional 10,000 watts |
The watt rating is the total estimated alternating current (ac) energy output of the solar system. The total dc energy output is not used.
The solar PV inspection fees shall include inverters, modules, panels, combiners, converters, charge controllers, disconnecting means and electrical conductors between the inverter and the panelboard for stand-alone solar PV systems, or the conductors between the inverter and the service equipment or other power production, distribution and utilization system, such as a utility system and its connected loads, that is external to and not controlled by the solar PV power system.
In addition to the basic solar PV inspection fees, additional inspection fees may be applicable on large-scale projects for the inspection of additional electrical infrastructure between the inverter output circuit nd the electrical production and distribution network. The inspection fees shall be calculated according to Minnesota Statute 326B.37, Subdivisions 2, 3, 4, and 6, paragraphs (d), (f), (j), and (k)
*Fees are doubled if the work starts before the permit is issued
Informational Handouts
Manufactured Home Installation
Section 205.10 R-4 Manufactured Home Park District Regulations
Lot Requirements and Setbacks (Section 205.10.03)
- Lot Area:
- Each dwelling site in a manufactured home park shall have a minimum of 3,500 square feet.
- Setbacks:
- No manufactured home shall be placed any closer to a public street right-of-way than thirty-five (35) feet nor any closer to any other district than fifteen (15) feet.
- Placement setbacks from any neighboring manufactured homes within the park shall be directed to the park manager.
Application Requirements
Manufactured Home Installation Requirements
Note: separate permits are required for plumbing, mechanical and electrical work.
Fees
$101.00
Mechanical Permits
A city contractor license is required for all HVAC, mechanical and gas services projects (furnace, air conditioning, ductwork, gas dryer, fireplace, etc.) For the full list, see the Contractor License tab to the left.
If you do not have a HVAC or Gas Services contractor license with the City of Fridley, please apply for the license before you apply for the permit as the license number is required within the permit application.
Rental Properties: all permits shall be obtained by a licensed contractor.
Fees
Mechanical Fees - Commercial
The fees are based off of the total job valuation (including labor and materials).
Permit Fee is calculated 1.25% of the job valuation (Minimum fee is $35.00 plus surcharge).
State Surcharge is .0005 times job valuation (Minimum fee is $0.50).
Mechanical Fees - Residential
The fees are based on $10 per fixture, EXCEPT where noted. Minimum fee is $35 plus state surcharge. Fees will be calculated based on fixtures indicated on application (I.E. Furnace (1) and Air Conditioner (1) = $60 plus the $1 surcharge. The total for the permit would be $61).
State Surcharge is a flat fee of $1.
Fixture Type | Fixture Fee Total |
Air Conditioner | $25 |
Air to Air Exchanger | $15 |
Boiler | $35 |
Chimney Liner | $10 |
Duct Work | $10 |
Fireplace (Gas) | $10 |
Fireplace (Wood) | $35 |
Furnace | $35 |
Gas Dryer | $10 |
Gas Piping | $10 |
Gas Range/Oven | $10 |
New Gas Grill | $10 |
Gas Unit Heater | $10 |
Pool Heater | $35 |
Ventilation | $15 |
Plumbing Permits
Rental Properties: all permits shall be obtained by a licensed contractor.
Fees
Plumbing Fees - Commercial
The fees are based off of the total job valuation (including labor and materials).
Permit Fee is calculated 1.25% of the job valuation (Minimum fee is $35 plus surcharge).
State Surcharge is .0005 times job valuation (Minimum fee is $0.50).
Plumbing Fees - Residential
The fees are based on $10 per fixture, EXCEPT where noted. Minimum fee is $35 plus state surcharge. Fees will be calculated based on fixtures indicated on application (I.E. Water Heater (1) and Water Closet (1) = $45 plus the $1 surcharge. The total for the permit would be $46).
State Surcharge is a flat fee of $1.
Fixture Type | Fixture Fee Total |
Bath Sink/Lav | $10 |
Bathtub | $10 |
Clothes Washer | $10 |
Dishwasher | $10 |
Floor Drains | $10 |
Kitchen Sink | $10 |
Laundry Tray | $10 |
Shower | $10 |
Swimming Pool | $10 |
Water Closet | $10 |
Water Heater | $35 |
Water Meter | $10 |
Water Piping | $10 |
Water Softener | $35 |
Backflow Preventer for Irrigation | $15 |
Other | $10 |
Miscellaneous Documents
Did you know you may access residential property files online?
Find residential property files online
You will see folders with a letter or number by it. This will be the first letter or number of the street name. Once you open a folder, you will then see the house numbers. Click on the house number you are looking. Permit information may be found in the folders labeled; Inspections and Permits and Pre2010 Permits and Docs.
The Sewer Availability Charge (SAC) is determined by the Metropolitan Council. Please visit their website by clicking on the link below for more information.
Click here to be redirected to the Metropolitan Council's webpage
Watershed District Websites
Coon Creek Watershed District | cooncreekwd.org |
Rice Creek Watershed District | ricecreek.org |
Mississippi Watershed Management Organization | mwmo.org |
2020 Minnesota Building Code Administration - 1300.0120 Permits Subp. 4 Work exempt from permit. Exemptions from permit requirements of the code do not authorize work to be done in any manner in violation of the code or any other laws or ordinances of this jurisdiction. Permits shall not be required for the following:
A. Building: |
(1) One-story detached accessory structures, used as tool and storage shed, playhouses, and similar uses, provided the floor area does not exceed 200 square feet; |
(2) Fences not over 7 feet high; |
(3) Oil derricks; |
(4) Retaining walls that are not over 4 feet (1,219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II, or III-A liquids; |
(5) Water tanks supported directly upon grade if the capacity does not exceed 5,000 gallons (18,927 L) and the ratio of height to diameter or width does not exceed 2 to 1; |
(6) Sidewalks and driveways that are not part of an accessible route; |
(7) Decks and platforms not more than 30 inches (762 mm) above adjacent grade and not attached to a structure with frost footings and which is not part of an accessible route; |
(8) Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; |
(9) Temporary motion picture, television, and theater stage sets and scenery; |
(10) Prefabricated swimming pools installed entirely above ground accessory to dwelling units constructed to the provisions of the International Residential Code or R-3 occupancies constructed to the provisions of the International Building Code, which do not exceed both 5,000 gallons in capacity (18,925 L) and a 24-inch (610 mm) depth; |
(11) Window awnings supported by an exterior wall that do not project more than 54 inches (1372 mm) from the exterior wall and do not require additional support, when constructed under the International Residential Code or Group R-3 and Group U occupancies constructed to the provisions of the International Building Code; |
(12) Movable cases, counters, and partitions not over five feet, nine inches (1753 mm) in height; |
(13) Swings and other playground equipment; and |
(14) Electric substation facilities, including: (a) foundations that support electrical equipment; (b) foundations and enclosures affixed with an Interstate Industrialized Buildings Commission (IIBC) label that contain electrical equipment only; and (c) fencing that encloses the substation facilities or any part thereof. |
Replacement of interior doors such as a patio door, entry door, bedroom door.
Engineering Permits
Any work being done in the City Right of Way or that will be disturbing land in a watershed area requires a permit from the Engineering Division. Engineering also approves permits for water and sewer repairs and driveway replacements and curb cuts.
Note: All Engineering permits shall be completed with an online application. Under "Application Type" select Engineering Permit and then select the corresponding Sub Type.
Attention Contractors:
As of January 1, 2023, the City of Fridley is requiring that any general contractor intending to apply for an Engineering related permit (ROW, Driveway, Grading, Load Limits, Water/Sewer) obtain a valid license with the City. Please visit our online portal and click on the option that says "Apply For a License" on the right-hand side. That will bring you to CitizenServe where you can either sign-in with an existing account or register as a new user. Once you're signed in, you can begin the application. You will need to select the option for Engineering Contractor License in the first drop down menu, and the sub-type will be chosen based on the type of work your company will be doing.
Questions? Contact our Engineering Division at 763-572-3554.
Grading Permit
A Grading (Land Alteration) Permit is required for topographic alterations involving the movement of more than 10 cubic yards of material on steep slopes or within shore and bluff impacted zones, the movement of more than 50 cubic yards of material outside of steep slopes or within shore and bluff impacted zones, and/or grading or filling of type 2-8 wetlands.
A Right-of-Way Permit is required when any work is performed in the City of Fridley within the street right-of-way. Right-of-way is the property on which the street is located and that extends behind the curb approximately 10 to 15 feet.
A Driveway/Right-of-Way Permit is required when a resident or contractor is removing/replacing the existing driveway regardless of curb removal or installing a new driveway.
A Water and Sewer Permit is required to allow for the installation, repair, removal or relocation of the utility which projects onto, under or over any City of Fridley public property or right-of-way, including the municipal sanity sewer or water service distribution system. A permit is also required to tap or disconnect from the City's water mains and hydrants or to install a water meter.
A Load Limit Permit is needed to move oversize loads and an approved permit must be in hand prior to movement. For additional information on current Load Limits and Road Restriction parameters, please visit this page.
Fire Permits
There are separate permit applications and submission requirements for fire suppression systems, fire alarm systems, and tank removal process. More additions still to come.
Residents can submit permit applications for fire alarm systems, fire suppression systems, fuel storage tank removal, prescribed burns and more on the Fire Permits webpage.
Gun Permits
The City of Fridley processes Permits to Purchase for Fridley residents. Permit to Carry applications must be filed through Anoka County.
The City of Fridley is now processing permits to purchase through our Citizen Serve portal. You must be a Fridley resident to apply. Upon approval, permits to purchase will be mailed to your residence.
Apply for a Permit to Purchase
Questions? Call Public Safety at 763-572-3629.
The Anoka County Sheriff’s Office is responsible for issuing all Permit to Carry applications for Anoka County.
Sign Permits
Sign Permits are required for new, relocated, or redesigned exterior signs within the City of Fridley. Before a permanent sign may be constructed, the sign erector must submit an application for Contractor license to the City.
Learn more about when a permit is needed on the Sign Permit webpage.
Questions about a sign permit? Call Planning and Zoning at 763-572-3592.